Anybody know how L O N G it takes to pre-drill 100 holes, drill 100 1 1/2 holes then sand 100 holes? About 5 times longer then I thought
But it is done, now just working on the "plumbing" and I should be planting this afternoon. I added some utility gate handles so I can move the system inside at night pretty easy. It snowed here last night but the rain melted it away. All around us is getting hammered with snow. Weird climate issues going on. Been hammering my husband pretty bad about getting that greenhouse up and going i.e I would not be building systems in our kitchen
Any way, will post some pictures tonight after I get it going....